Home | Specs |
Refits | About |
March - May 2018 Happy Birthday, AmzerZo. We are honored to be the ones giving AmzerZo her 20th birthday present. The make-over continues. March 2, 2018
Finally spring?
Just days after bud break, the first (and only?) snowfall of the season. This week, Metal Marine fished blasting and sanding the hull and decks, and applied primer to stave off oxidation. The primer made poor AmzerZo look sick. March 9, 2018
AmzerZo
is moved to Paris temporarily.
The hangar, not the city!
Shortly after, we were summoned by a client. The extra cash coming at just the right time, we decided to let work continue without us. March 17, 2018 Luckily
Metal Marine sent photos of the
progress. Let the bottom spraying
begin.
March 27, 2018 Sexy lady. April
13, 2018
Da Captain took a quick trip back to France to check in on the progress. We closed 90% the holes and got rid of the trip hazards. We're very excited about the flush hatch, drain holes and all. A beautifully fair bum. April
25, 2018
Another batch of update pics from Metal Marine. The new rigging has arrived! May 28, 2018 This time it was Da Admiral's turn to visit. AmzerZo looked much less sickly and had been moved back to Paris. Look at those gorgeous lines. Unfortunately for us, Metal Marine lost their painter, so work came to a halt during June and July. In France, the arrival of August means everyone goes on holiday (and it's also too hot in the Provence to paint), so it wouldn't be until September that work on AmzerZo would continue. Luckily we were in the US making some cash and we prefer to be onsite to supervise the work, so it worked out. Back to February 2018 Continue to September 2018
|